Home

Statewide

District 1

District 2

District 3

District 4&6

District 5

District 7:

 by Stakeholder

 by Entity

Turnpike

 

 Send Your 

 Comments



Parking Management Equipment Package

Description:

This Equipment package provides the capability to detect and classify properly equipped vehicles entering and exiting the parking facility, and to maintain database information with parking availability and pricing structure information. This capability shall be provided through the utilization of active/passive tag readers and database software containing parking pricing structure and current availability. Wireline communications with clearinghouse operators (the Financial Institution terminator) and the back office (the parking service provider terminator) enable processing of financial transactions and external coordination.

 

Included in:

CBD Parking Systems
CVO Parking Facilities
Service Plazas
Special Event Parking Systems

Processes:

1.2.5.1Determine Parking Lot State
1.2.5.3Provide Parking Lot Operator Interface
7.2.1.9Manage Parking Lot Reservations
  

User Service Requirements (fully or partially addressed):

1.0TRAVEL AND TRAFFIC MANAGEMENT
1.6TRAFFIC CONTROL
1.6.0ITS shall provide a Traffic Control capability. Traffic Control provides the capability to efficiently manage the movement of traffic on streets and highways. Four functions are provided which are (1) Traffic Flow Optimization, (2) Traffic Surveillance, (3) Control Function, and (4) Provide Information. This will also include control of network signal systems with eventual integration of freeway control.
1.7INCIDENT MANAGEMENT
1.7.0ITS shall include an Incident Management (IM) function. Incident Management will identify incidents, formulate response actions, and support initiation and ongoing coordination of those response actions. Six major functions are provided which are (1) Scheduled Planned Incidents, (2) Identify Incidents, (3) Formulate response Actions, (4) Support Coordinated Implementation of Response Actions, (5) Support Initialization of Response to Actions, and (6) Predict Hazardous Conditions.
1.7.4Incident Management shall provide the capability to predict the time and location of hazardous conditions that may cause an incident.
1.8TRAVEL DEMAND MANAGEMENT
1.8.0Travel Demand Management will generate and communicate management and control strategies that will support and facilitate the implementation of TDM programs, policies and regulations. It consists of two major functions which are (1) Increase Efficiency of Transportation System and (2) Provide Wide Variety of Mobility Options.
1.8.2TDM shall include a processing function.
1.8.2.1The processing function shall provide the capability to generate management and control strategies that facilitate the implementation of policies and regulations designed to address the following:
1.8.2.1(c)Parking management and control.
1.8.3TDM shall include a sensors/control function.
1.8.3.1The sensors/control function shall provide the capability to gather information needed for the generation of management and control strategies to include, but not be limited to the, following:
3.0ELECTRONIC PAYMENT
3.1ELECTRONIC PAYMENT SERVICES
3.1.4ITS shall include an Electronic Payment Services Integration (EPSI) feature.
3.1.4.3EPSI shall collect and provide that usage data needed to develop pricing strategies that favor certain transportation modes or routes.
  
The detailed process and user service requirement traceability information on this page was extracted from the National ITS Architecture. Consult the National ITS Architecture web site for more information.

This page was last updated on 12-15-2000 using Web Spinner Technology.