Home

Statewide

District 1

District 2:

 by Stakeholder

 by Entity

District 3

District 4&6

District 5

District 7

Turnpike

 

 Send Your 

 Comments



Interface Definition

Rural Traffic Signal Control System

TO Rural Traffic Signal Equipment

 

Architecture Flow Definitions

fault reports   (Planned)  

Reports from field equipment (sensors, signals, signs, controllers, etc.) which indicate current operational status.

 

hri control data   (Planned)  

Data required for HRI information transmitted at railroad grade crossings and within railroad operations.

 

hri request   (Planned)  

A request for highway-rail intersection status or a specific control request intended to modify HRI operation.

 

hri status   (Planned)  

Status of the highway-rail intersection equipment including both the current state or mode of operation and the current equipment condition.

 

request for right-of-way   (Planned)  

Forwarded request from signal prioritization, signal preemption, pedestrian call, multi-modal crossing activation, or other source for right-of-way.

 

sensor and surveillance control   (Planned)  

Information used to configure and control sensor and surveillance systems at the roadside.

 

signal control data   (Planned)  

Information used to configure and control traffic signal systems.

 

signal control status   (Planned)  

Status of surface street signal controls.

 

traffic flow   (Planned)  

Raw and/or processed traffic detector information which allows derivation of traffic flow variables (e.g., speed, volume and density measures).

 

This page was last updated on 12-11-2000 using Web Spinner Technology.